Corrupt Small Claims' Tribunal referee [a magistrate] William J [Bill] Randall implements the Anglican corruption of corrupt Chief Justice Paul de Jersey,...
CDDM_IntroSubMenuSubSubMenu150.php
The Kramer Group of Frank Kramer of the Pacific Islands and Australia has unwittingly jumped on a sinking ship caused by the criminal history of Wayne Goss and his criminal destruction of evidence required for a court trial...
CDDM_IntroSubMenuSubSubMenu150.php
MENU: Wayne Goss' Free TV Australia. He Destroyed the Heiner Evidence; a Crime & Breach of 'Directors' Fiduciary Duty...
CDDM_IntroSubMenuSubSubMenu150.php
CMC's Dangerous Liaisons Report is a FRAUD & a CON on our Community, to HIDE, STEEL & HARDEN CORRUPTION in POLICE, COURTS & GOVERNMENT...
CDDM_IntroSubMenuSubSubMenu150.php
Corrupt Small Claims' Tribunal referee [a magistrate] William J [Bill] Randall implements the Anglican corruption of corrupt Chief Justice Paul de Jersey,...
CDDM_IntroSubMenuSubSubMenu150.php
The Kramer Group of Frank Kramer of the Pacific Islands and Australia has unwittingly jumped on a sinking ship caused by the criminal history of Wayne Goss and his criminal destruction of evidence required for a court trial...
CDDM_IntroSubMenuSubSubMenu150.php
MENU: Wayne Goss' Free TV Australia. He Destroyed the Heiner Evidence; a Crime & Breach of 'Directors' Fiduciary Duty...
CDDM_IntroSubMenuSubSubMenu150.php
CMC's Dangerous Liaisons Report is a FRAUD & a CON on our Community, to HIDE, STEEL & HARDEN CORRUPTION in POLICE, COURTS & GOVERNMENT...
CDDM_IntroSubMenuSubSubMenu150.php
NOTICE
TO INSTITUTIONAL SHAREHOLDERS, CREDIT AUDITORS, AND REGULATORY
BODIES:
This
repository contains verifiable primary source documentation,
statutory timelines, and corporate correspondence relating to a
commercial lending facility assumed by Westpac
Banking Corporation (ASX: WBC)
over a standalone commercial office development in Booval, Ipswich,
Queensland.
1.
ULTRA VIRES DEVELOPMENT APPROVAL STATUS The
underlying Impact Assessable Material Change of Use (MCU) approval
issued by the Ipswich City Council (ICC) is fundamentally compromised
by jurisdictional and statutory defects, rendering it vulnerable to a
Declaration
of Invalidity
in the Planning and Environment Court of Queensland. Specifically,
the public record demonstrates:
Bypass
of Mandatory Public Notification:
The approval was issued without the statutory public notification
required for an Impact Assessable application in a Character Zone,
stripping third parties of their lawful submission and appeal
rights.
Omission
of Mandatory Blueprints:
Key operational blueprints verifying Character Zone compliance and
boundary setbacks were omitted from the final stamped approval.
Unlawful
Deferral of Assessment (Condition 16):
The decision notice unlawfully deferred the assessment of 1-metre
earthworks and a concrete car park directly adjacent to the common
boundary, contravening the Planning
Act 2016
(Qld).
Usurpation
of Statutory Civil Rights:
The approval purports to mandate a 1.8m double-overlapped timber
boundary fence via planning condition, unlawfully overriding the
statutory frameworks of the Neighbourhood
Disputes (Dividing Fences) Act 2011
(Qld).
2.
MATERIAL CREDIT & COLLATERAL EXPOSURE Following
the withdrawal of the primary financier (National Australia Bank) due
to the legal defects outlined above, Westpac Banking Corporation
assumed the debt facility and extracted two additional private
properties as secondary collateral to offset the litigation risk.
Institutional investors, proxy advisors, and external credit auditors
should take note that the primary physical asset securing this loan
relies upon an ultra
vires
administrative instrument.
3.
LEGAL & EVIDENTIARY DISCLAIMER All
documents, planning extracts, and correspondence hosted within this
directory are published in the public interest for corporate
governance transparency, shareholder risk assessment, and regulatory
oversight. The materials presented herein constitute accurate
reproductions of public records, statutory instruments, and formal
notices served upon relevant corporate and government entities.
Nothing on this page constitutes personal financial or legal advice.
Parties relying on the underlying asset for security, valuation, or
audit purposes are advised to conduct independent legal verification
of the Ipswich City Council decision notice and associated Planning
and Environment Court risks.
Notice of Risk to Institutional Shareholders & Credit Auditors. INVESTOR RISK BRIEFING: 115 BRISBANE ROAD, BOOVAL
Target Security: Westpac Banking Corporation (ASX: WBC) | Mortgage Ref: No 723564433 Subject: Commercial Credit Risk, Structural Non-Compliance, and Title Defect Audit AGM Action Date: 16 December 2026
NOTICE TO INSTITUTIONAL FIDUCIARIES, NOMINEES, AND AUDITORS:
This dossier compiles uncontestable, documented evidence establishing that Westpac capital is actively financing an unlawful commercial development built on an administrative nullity, compromised by physical encroachment, and subject to pending legal challenge.
Executive Summary
This independent audit documents a critical failure of internal credit due diligence and asset validation protocols within Westpac's commercial lending division. The primary security asset at 115 Brisbane Road, Booval, Queensland relies on an ultra vires development approval framework. National Australia Bank (NAB) previously terminated its construction funding facility for this exact development upon auditing these identical statutory defects. Westpac subsequently stepped into the risk vacuum, demanding supplementary cross-collateralization over two additional properties to mask the toxic exposure of the core asset.
1. PURPORTED COUNCIL APPROVAL & STAMPED ENGINEERING DRAWINGS
2024-07-30
PDF
ICC Purported Decision Notice (Doc ID A9676716): Material Change of Use (Business Use / Professional Office) at 115 Brisbane Road approved without mandatory public notification. Contains ultra vires Condition 15(c) purporting to mandate a 1.8m double-overlapped timber fence along the eastern boundary.
Approved Site & Engineering Drawings by Mark King / KAE (Doc ID A9674787): Prepared for Jonathan Collins / G.J. Gardner Homes. Shows the true cadastral boundary, the sewer manhole cover adjacent to the 5.9m boundary mark, and the ~29m blue boundary line annotating Condition 15(c).
2. AGGRAVATED TRESPASS VIDEO RECORDINGS (4 NOVEMBER 2026)
2026-11-04 13:06–15:10
12 MP4s
Recorded Physical Trespass Across Locked Boundary: Twelve (12) consecutive timestamped videos capturing contractors operating pneumatic nail guns and reaching across the boundary line of 117–119 Brisbane Road to attach palings onto the western face of the 27m structure despite repeated verbal warnings, breaching Jonathan Collins's written undertaking of 12 August 2026.
Enlargement of Approved Site Plan (5.9m Wall & Sewer Manhole): High-resolution crop of Drawing A9674787 proving the cadastral boundary position relative to the sewer manhole cover and the 5.9m boundary mark.
Construction of Encroaching 2.1m Block Wall Extension & Blocklayer Confrontation: Early concrete apron gap photos (20 Mar 2026) and active blocklaying photos/screenshots (7 Apr 2026) showing the 2.1m × 0.3m extension built onto 117–119 Brisbane Road beyond the 5.9m section.
Broken & Loose Foundations of 8-Metre Block Wall: Six close-up photographs documenting fractured, loose, and defective mortar/footing conditions along the 8-metre boundary block wall.
Overhead & Macquarie Street Views (8m Block Wall & Sewer Manhole Cover): Views looking west over the block wall and east from Macquarie Street confirming the wall's alignment with the rear of the shed, the sewer manhole cover south of the north end, and the junction with the timber structure.
Artificial Raising of Ground Level & Timber Retaining Planks: Chronological series showing fill placement, 200mm × 50mm pine retaining planks, and concrete pours raising the car park slab to a horizontal level elevated ~900mm above natural ground level.
1. Incurable Boundary Breaches (Queensland Development Code)
The developer has executed a 27-metre continuous concrete panel and timber picket vertical structure positioned only 100mm from the eastern side boundary to retain an un-adjudicated horizontal land-fill car park. Under QDC Parts MP 1.1 and MP 1.2, any structure built closer than 1.5m to a side setback must satisfy strict built-to-boundary criteria. This structure fails the 9-metre maximum statutory length threshold and explicitly breaches the 750mm absolute maintenance clearance rule. No mandatory Siting Variation (Concurrence Agency Referral) exists, rendering the entire boundary footprint uncertifiable and unlawful under the Planning Act 2016 (Qld).
2. Substandard Material Integration & Hydrostatic Engineering Hazards
Physical site tracking reveals that the terminal bays at each end of the car park retaining wall consist of un-engineered softwood timber planks (approx. 200mm x 50mm) rather than concrete panels, in direct violation of AS 4678 (Earth-Retaining Structures). This configuration traps a massive 500mm wide industrial crushed-gravel and PVC stormwater infrastructure network right against the boundary. Under hydrostatic load, the geotextile filter fabric membrane is already tearing and blowing out through severe structural gaps beneath the panels, guaranteeing rapid material rot, land subsidence, and stormwater washouts onto the adjoining property.
The developer's concrete block retention wall actively crosses the registered 5.9-metre historic survey boundary provision, marching 300mm onto adjoining titled land directly over an active sewer line. Furthermore, contractors have physically entered the locked adjoining property without consent, smashing common fence infrastructure to install framing within the non-compliant 100mm gap, resulting in active emergency 000 police logs and notifications to the QLD Police Commissioner.
4. Evading Public Scrutiny via Falsified "Minor Change" Routing
On 31 July 2026, the Ipswich City Council purported to approve this heavy engineering drainage and car park infrastructure overhaul as a "Minor Change" (8909/2023/MAMC/A), arbitrarily ruling that "No Public Notification was Required." This maneuver was executed to shield a high-impact engineering footprint from public objections and court challenges. This jurisdictional error forms the basis of a pending Declaratory Proceeding in the Queensland Planning and Environment Court to have the approval declared void ab initio.
Verified Evidence Vault & Originals
Institutional proxy analysts and credit auditors are invited to download the verified primary source material below to audit Westpac's exposure:
1. Audio-Visual Verification Vault
Access unedited, high-definition source video capturing active corporate trespass, fence destruction, and live site measurements proving the 3.1m structure execution.
High-resolution photographic evidence documenting the softwood panel insertion, the ruptured geotextile membranes, the infrastructure gaps, and the 150mm stormwater pipelines.
Download raw PDF data bundles including the historical registered survey boundary plans, the NPII records, and the 26 July 1994 Registered Trustee Ernst & Young discharge notice.
Review the formal statutory complaints and director misconduct reports filed with ASIC ([email protected]) and the QLD Crime and Corruption Commission (CCC).