My logo, my TRADEMARK, is the MRI of my skull, showing gross assymetry,aka DEFORMITY = ugliness and target of bullies. The HAIG REPORT: the EVIDENCE My logo, my TRADEMARK, is the MRI of my skull, showing gross assymetry,aka DEFORMITY = ugliness and target of bullies.

   It is Our legal, social and moral DUTY to EXPOSE CRIME, FRAUD & CORRUPTION plus Lying and Hypocrisy in Public Life, Including Judges & magistrates 
 

Fraud, Corruption & attempted  MURDER 
covered-up by Queensland police, EXPOSED 

DirectoryWebsite/header.php

Westpac Booval Risk Dossier

commonheader.php

Reg. Office: 254 Hawken Drive, St Lucia, Qld. 4067, Australia.  
Editor-in-Chief:  Russell G H Mathews BCom BSc LLB BA      EMAIL us anytime:  Please Please make a donation using BPay.  using  Please make a donation using BPay. 

considerevidence.php

Consider the evidence! Please Please make a donation using BPay.  using  Please make a donation using BPay.  

Follow @HaigReport
??   ??   ???? Tweet  
Share on Facebook Share on Facebook  

See: HaigReport's Menu of Menus of Sites of Related Fraud & Corruption Topics:

/CodingPHP/includedSeeContentPageFileNameURL.php

  Click here to GoTo Detail:=> Index: Westpac Booval Risk Dossier

../Corrupt Police& Magistrates Menu.php An example of a CASCADING Drop Down Menu.

MENU: Rantala-Gate: Corrupt Police & Magistrates Mafia.

CDDM_StartMenu160.phpCDDM_StartMenu160.phpCDDM_StartMenu160.phpCDDM_StartMenu160.phpCDDM_StartMenu160.php

See: the Menu: for Westpac Booval Risk Dossier

Follow @HaigReport
??   ??   ???? Tweet  
Share on Facebook Share on Facebook  
http://HaigReport.com/includedSeeTodaysHotTopics.php

See: Today's HAIG HOT_TOPICS  => Click HERE <= 

/CodingPHP/includedSeeContentPageFileNameURL.php

  Click here to GoTo Detail:=> Index: Westpac Booval Risk Dossier

Follow @HaigReport
??   ??   ???? Tweet  
Share on Facebook Share on Facebook  

See: HaigReport's Menu of Menus of Sites of Related Fraud & Corruption Topics:

 Content: Index: Westpac Booval Risk Dossier

../Corrupt Police& Magistrates Menu.php An example of a CASCADING Drop Down Menu.

MENU: Rantala-Gate: Corrupt Police & Magistrates Mafia.

CDDM_StartMenu160.phpCDDM_StartMenu160.phpCDDM_StartMenu160.phpCDDM_StartMenu160.phpCDDM_StartMenu160.php

See: the Menu: for Westpac Booval Risk Dossier

Follow @HaigReport
??   ??   ???? Tweet  
Share on Facebook Share on Facebook  

Index: Westpac Booval Risk Dossier:

Westpac Booval Risk Dossier | Asset Compliance Audit

NOTICE TO INSTITUTIONAL SHAREHOLDERS, CREDIT AUDITORS, AND REGULATORY BODIES:

This repository contains verifiable primary source documentation, statutory timelines, and corporate correspondence relating to a commercial lending facility assumed by Westpac Banking Corporation (ASX: WBC) over a standalone commercial office development in Booval, Ipswich, Queensland.

1. ULTRA VIRES DEVELOPMENT APPROVAL STATUS
The underlying Impact Assessable Material Change of Use (MCU) approval issued by the Ipswich City Council (ICC) is fundamentally compromised by jurisdictional and statutory defects, rendering it vulnerable to a
Declaration of Invalidity in the Planning and Environment Court of Queensland. Specifically, the public record demonstrates:

  • Bypass of Mandatory Public Notification: The approval was issued without the statutory public notification required for an Impact Assessable application in a Character Zone, stripping third parties of their lawful submission and appeal rights.

  • Omission of Mandatory Blueprints: Key operational blueprints verifying Character Zone compliance and boundary setbacks were omitted from the final stamped approval.

  • Unlawful Deferral of Assessment (Condition 16): The decision notice unlawfully deferred the assessment of 1-metre earthworks and a concrete car park directly adjacent to the common boundary, contravening the Planning Act 2016 (Qld).

  • Usurpation of Statutory Civil Rights: The approval purports to mandate a 1.8m double-overlapped timber boundary fence via planning condition, unlawfully overriding the statutory frameworks of the Neighbourhood Disputes (Dividing Fences) Act 2011 (Qld).

2. MATERIAL CREDIT & COLLATERAL EXPOSURE
Following the withdrawal of the primary financier (National Australia Bank) due to the legal defects outlined above, Westpac Banking Corporation assumed the debt facility and extracted two additional private properties as secondary collateral to offset the litigation risk. Institutional investors, proxy advisors, and external credit auditors should take note that the primary physical asset securing this loan relies upon an
ultra vires administrative instrument.

3. LEGAL & EVIDENTIARY DISCLAIMER
All documents, planning extracts, and correspondence hosted within this directory are published in the public interest for corporate governance transparency, shareholder risk assessment, and regulatory oversight. The materials presented herein constitute accurate reproductions of public records, statutory instruments, and formal notices served upon relevant corporate and government entities. Nothing on this page constitutes personal financial or legal advice. Parties relying on the underlying asset for security, valuation, or audit purposes are advised to conduct independent legal verification of the Ipswich City Council decision notice and associated Planning and Environment Court risks.



Notice of Risk to Institutional Shareholders & Credit Auditors.
INVESTOR RISK BRIEFING: 115 BRISBANE ROAD, BOOVAL

Target Security: Westpac Banking Corporation (ASX: WBC) | Mortgage Ref: No 723564433
Subject: Commercial Credit Risk, Structural Non-Compliance, and Title Defect Audit
AGM Action Date: 16 December 2026
NOTICE TO INSTITUTIONAL FIDUCIARIES, NOMINEES, AND AUDITORS:
This dossier compiles uncontestable, documented evidence establishing that Westpac capital is actively financing an unlawful commercial development built on an administrative nullity, compromised by physical encroachment, and subject to pending legal challenge.

Executive Summary

This independent audit documents a critical failure of internal credit due diligence and asset validation protocols within Westpac's commercial lending division. The primary security asset at 115 Brisbane Road, Booval, Queensland relies on an ultra vires development approval framework. National Australia Bank (NAB) previously terminated its construction funding facility for this exact development upon auditing these identical statutory defects. Westpac subsequently stepped into the risk vacuum, demanding supplementary cross-collateralization over two additional properties to mask the toxic exposure of the core asset.

MASTER EVIDENTIARY INDEX — 115 / 117–119 BRISBANE ROAD, BOOVAL QLD 4304

Direct Native Server Directories (Unedited File Timestamps):   📁 /documents/ 📷 /photos/ 🎥 /videos/

Core Risk Dimensions & Statutory Breaches

1. Incurable Boundary Breaches (Queensland Development Code)

The developer has executed a 27-metre continuous concrete panel and timber picket vertical structure positioned only 100mm from the eastern side boundary to retain an un-adjudicated horizontal land-fill car park. Under QDC Parts MP 1.1 and MP 1.2, any structure built closer than 1.5m to a side setback must satisfy strict built-to-boundary criteria. This structure fails the 9-metre maximum statutory length threshold and explicitly breaches the 750mm absolute maintenance clearance rule. No mandatory Siting Variation (Concurrence Agency Referral) exists, rendering the entire boundary footprint uncertifiable and unlawful under the Planning Act 2016 (Qld).

2. Substandard Material Integration & Hydrostatic Engineering Hazards

Physical site tracking reveals that the terminal bays at each end of the car park retaining wall consist of un-engineered softwood timber planks (approx. 200mm x 50mm) rather than concrete panels, in direct violation of AS 4678 (Earth-Retaining Structures). This configuration traps a massive 500mm wide industrial crushed-gravel and PVC stormwater infrastructure network right against the boundary. Under hydrostatic load, the geotextile filter fabric membrane is already tearing and blowing out through severe structural gaps beneath the panels, guaranteeing rapid material rot, land subsidence, and stormwater washouts onto the adjoining property.

3. Documented Property Encroachment & Trespass Summary Offences

The developer's concrete block retention wall actively crosses the registered 5.9-metre historic survey boundary provision, marching 300mm onto adjoining titled land directly over an active sewer line. Furthermore, contractors have physically entered the locked adjoining property without consent, smashing common fence infrastructure to install framing within the non-compliant 100mm gap, resulting in active emergency 000 police logs and notifications to the QLD Police Commissioner.

4. Evading Public Scrutiny via Falsified "Minor Change" Routing

On 31 July 2026, the Ipswich City Council purported to approve this heavy engineering drainage and car park infrastructure overhaul as a "Minor Change" (8909/2023/MAMC/A), arbitrarily ruling that "No Public Notification was Required." This maneuver was executed to shield a high-impact engineering footprint from public objections and court challenges. This jurisdictional error forms the basis of a pending Declaratory Proceeding in the Queensland Planning and Environment Court to have the approval declared void ab initio.

Verified Evidence Vault & Originals

Institutional proxy analysts and credit auditors are invited to download the verified primary source material below to audit Westpac's exposure:

1. Audio-Visual Verification Vault

Access unedited, high-definition source video capturing active corporate trespass, fence destruction, and live site measurements proving the 3.1m structure execution.

View Trespass Videos

2. Photographic Defect Log

High-resolution photographic evidence documenting the softwood panel insertion, the ruptured geotextile membranes, the infrastructure gaps, and the 150mm stormwater pipelines.

View Photo Framework

3. Title, Survey & Council Records

Download raw PDF data bundles including the historical registered survey boundary plans, the NPII records, and the 26 July 1994 Registered Trustee Ernst & Young discharge notice.

Download Document Bundle

4. Regulatory Submissions & Filings

Review the formal statutory complaints and director misconduct reports filed with ASIC ([email protected]) and the QLD Crime and Corruption Commission (CCC).

View Regulatory Filings
Administrative Notice: Due to a permanent neurological processing injury, all communications, investor enquiries, and regulatory notifications regarding this dossier must be conducted exclusively in writing via email to maintain a transparent, legally binding trail. Anonymous tracking codes are integrated into all document downloads to audit access by institutional fund nodes.

Menu: Westpac Booval Risk Dossier:

Date Type Evidentiary Description & Legal / Technical Significance Direct Exhibit Link
1. PURPORTED COUNCIL APPROVAL & STAMPED ENGINEERING DRAWINGS
2024-07-30 PDF ICC Purported Decision Notice (Doc ID A9676716): Material Change of Use (Business Use / Professional Office) at 115 Brisbane Road approved without mandatory public notification. Contains ultra vires Condition 15(c) purporting to mandate a 1.8m double-overlapped timber fence along the eastern boundary. View Decision Notice →
2024-07-30 PDF Approved Site & Engineering Drawings by Mark King / KAE (Doc ID A9674787): Prepared for Jonathan Collins / G.J. Gardner Homes. Shows the true cadastral boundary, the sewer manhole cover adjacent to the 5.9m boundary mark, and the ~29m blue boundary line annotating Condition 15(c). View Drawings →
2. AGGRAVATED TRESPASS VIDEO RECORDINGS (4 NOVEMBER 2026)
2026-11-04
13:06–15:10
12 MP4s Recorded Physical Trespass Across Locked Boundary: Twelve (12) consecutive timestamped videos capturing contractors operating pneumatic nail guns and reaching across the boundary line of 117–119 Brisbane Road to attach palings onto the western face of the 27m structure despite repeated verbal warnings, breaching Jonathan Collins's written undertaking of 12 August 2026. Open All 12 Videos →
Clip 06 (ID Face) →
3. 8-METRE BLOCK WALL ENCROACHMENT, FOUNDATIONS & MANHOLE SURVEY PROOF
2026-08-24 PNG Enlargement of Approved Site Plan (5.9m Wall & Sewer Manhole): High-resolution crop of Drawing A9674787 proving the cadastral boundary position relative to the sewer manhole cover and the 5.9m boundary mark. View Plan Crop →
2026-03-20
2026-04-07
4 JPGs
2 PNGs
Construction of Encroaching 2.1m Block Wall Extension & Blocklayer Confrontation: Early concrete apron gap photos (20 Mar 2026) and active blocklaying photos/screenshots (7 Apr 2026) showing the 2.1m × 0.3m extension built onto 117–119 Brisbane Road beyond the 5.9m section. Apron Gap (Mar 20) →
Block Wall Build (Apr 7) →
2026-08-15 6 JPGs Broken & Loose Foundations of 8-Metre Block Wall: Six close-up photographs documenting fractured, loose, and defective mortar/footing conditions along the 8-metre boundary block wall. Foundation Defect 1 →
Foundation Defect 2 →
2026-07-04
2026-11-15
7 JPGs Overhead & Macquarie Street Views (8m Block Wall & Sewer Manhole Cover): Views looking west over the block wall and east from Macquarie Street confirming the wall's alignment with the rear of the shed, the sewer manhole cover south of the north end, and the junction with the timber structure. Shed Alignment →
Manhole Over Wall →
Wall/Timber Junction →
4. RAISED HORIZONTAL SLAB, PVC DRAINAGE & BLOCKED SOUTHERN STORMWATER PIT
2026-08-05
to
2026-11-04
9 JPGs Artificial Raising of Ground Level & Timber Retaining Planks: Chronological series showing fill placement, 200mm × 50mm pine retaining planks, and concrete pours raising the car park slab to a horizontal level elevated ~900mm above natural ground level. Slab Raised (Aug 5) →
Fill Depth (Nov 4) →
Pine Planks (Nov 4) →
2026-07-22
to
2026-11-10
7 JPGs